Eric G. Clements 10200 East Dry
Creek Road
646-678-0568 Englewood, CO 80112
eric-clements@outlook.com PROFESSIONAL
SUMMARY Accomplished Project Planner/Scheduler with
over 17 years in heavy industrial construction and maintenance of chemical
plants, oil refineries, steel mills, electrical power plants and 7 years
experience in software design, development, configuration, testing, training,
deployment and production support. ·
Proficient in
management tools and processes such as Six Sigma, Capability Maturity Model,
Unified Modeling Language, Primavera P3e, TeamPlay, SureTrak, and Microsoft
Project Server 2003. ·
Demonstrated
proficiency in the entire software development and project lifecycle in
engineering, construction, manufacturing and financial environments. ·
Analyzed
complex business processes, schedules and plans; recommended and provided
appropriate solutions. Created and maintained large-scale project schedules.
Integrated, expanded, and consolidated where necessary. PROFESSIONAL
EXPERIENCE Global Edge
Consultants, Houston,
TX
09/2012 – 03/2014 Project
Planner/Scheduler URS
– Denver, CO Developed, resource loaded and managed the
engineering, procurement and construction schedule for the Keyera Rimbey
Turbo Expander Gas Plant in Alberta, Canada and the engineering schedule for
the removal of uranium and plutonium from the Dounreay Fast Reactor to the
Sellafield magnox plant for reprocessing. Assisted in the development of the
engineering, procurement and construction schedule for the PolyMet Mining
rebuild project and the engineering schedule for the Suncor Energy relief
analysis and flare study using Primavera P6 version 7.0. ·
Applied
updates, performed critical path analysis, generated look-aheads and variance
reports against project and previous update baselines for Process,
Mechanical, Piping, Civil, Structural, Electrical, Instrumentation and
Architectural engineering disciplines. ·
Modified and
revised schedule to reflect changes in scope, resource availability, vendor
engineering specifications and project execution changes. ·
Tracked
engineering document submittals, receipts and client approvals for
procurement schedule updates using the Aconex online project/document
management software. STSI Group, Wheaton, IL
10/2011– 06/2012 Maintenance Planner / Project Scheduler Citgo - 2012 Spring Turnaround –
Crude & Sat Gas Units – Lemont, IL Developed and executed the 2012 Spring
Turnaround Crude and Sat Gas schedules using P6 version 8.1.0. ·
Translated
detailed estimates for Exchangers, Towers, Tanks, Instrumentation, Piping,
Electrical and Rotating Equipment into resource loaded schedules. ·
Performed critical
path analysis and advised contractors on crew assignments and work sequence
revisions to resolve conflicts and reduce schedule duration. ·
Tracked
earned value metrics and communicated to executive management cost
performance index, schedule performance index, estimate to completion and
estimate at completion estimates through dashboards created specifically the
project. ·
Produced
daily look-aheads by unit, area and equipment for contractors, task owners
and craft for use in schedule updates and tracking of activities completed
for QA review. Turner & Townsend, Houston,
TX
01/2010– 08/2010 Project Planner/Scheduler/Cost Engineer British Petroleum - Operation
Exemplar/ Project Horizon – Warrenville, IL Developed and managed project schedules
using Primavera 6.2.1 and SAP R/3 for high priority BP projects. ·
Defined and
incorporated activity relationships and durations, assigned activity
resources and revised and consolidated activity codes. ·
Standardized
presentation and schedule update layouts. ·
Utilized
field observation reports to update schedule. ·
Developed
project interdependency matrix to support the Whiting Refinery Modernization
project. ·
Supported
weekly cost reporting and analysis for Operation Exemplar and Project
Horizon. Hallmark Services, Naperville, IL
10/2009– 12/2009 Sr. Consultant Project XTEND – Naperville, IL Researched, defined and documented existing
infrastructure and system software environment. Presented proposal for the
production implementation of an enterprise Configuration Management Database
(CMDB). Supported existing configuration management processes using
Tripwire Enterprise and Cherwell. ·
Structured
project plan in alignment with the Information Technology Infrastructure
Library (ITIL) framework. ·
Developed a
project plan, schedule, budget, resource requirement list and evaluated
in-house and new software solutions for production implementation. ·
Supported
existing configuration management and governance processes using Tripwire
Enterprise and Cherwell. FootBridge Staffing, Andover,
MA
03/2008– 06/2009 Project Planner/Scheduler ADM - Dry Grind Ethanol Project –
Cedar Rapids, IA Revised and managed the Engineering,
Procurement and Construction schedule of the ADM Cedar Rapids 400 MM Gallon
per Year Dry Grind Ethanol construction project using SureTrak 3.0c,
Microsoft Project 2003, and Primavera versions 3.1 and 6.0. Developed and integrated
schedules for Grain Elevators, Mash Prep, Dry Milling, Evaporation, Dryers,
Fermentation, Distillation, Regenerative Thermal Oxidizer, Utilities
Building, Cooling Towers, Fire Protection System, Alcohol Loadout, Co-Gen
Boiler, and Waste Water Treatment areas. Updated schedule weekly, and
reported progress using reports in SureTrak and Microsoft Excel. Created
custom report to view critical path in SureTrak. Shortened initial project
duration by 5 months through identification of duplicate tasks, recursive
activity logic and revising activity duration estimates. Revised original
schedule to an executable condition by completing the following: ·
Verified
activity relationships and duration estimates with area leads. ·
Assigned
activity resources, updated codes, contractors and P&ID reference
drawings. ·
Revised and
consolidated activity codes. ·
Standardized
presentation and schedule update layouts. ·
Developed
instruction manual for advanced access and report generation for management
resources. ·
Setup filters
for status reporting by area, discipline, contractor, area lead, and project
phase. ·
Cross
referenced and verified major equipment activity in schedule with P&ID
drawings. ·
Performed
detailed analysis of all plant areas and functions for inclusion in schedule. Ambitech Engineering Corp, Downers Grove, IL
02/2007– 03/2008 Project Planner Penford Ethanol Project – Cedar
Rapids, IA Developed and executed the civil,
structural, piping, equipment, electrical and instrumentation schedules for
all contractors in Dextrose Conversion, Fermentation, Distillation, Tank
Farm, and Loadout areas using Microsoft Project 2000 and Primavera 4.0 for
the 40 MM GPY ethanol plant new construction project and retrofit of existing
plant facilities. ·
Developed
initial project schedule using P&ID’s, equipment lists, and steel
fabrication drawings. Integrated timelines and interdependent activities of
each contractor. Tracked progress weekly, performed schedule analysis and
reported on contractor work efficiencies. ·
Participated
in each contractor’s scope definition, bid review, analysis and contract
award. Tracked RFI’s, developed field requisitions, and coordinated critical
material delivery and staging in a highly congested work site. Prepared cost
estimates for engineering revisions and additional scope as needed. Integrated Project Resources (IPR), Chicago, IL
10/2006 – 01/2007 Project Planner Wisconsin Public Service, Green Bay,
WI Evaluated the Wisconsin Public Service
Information Technology department’s proficiency and skill levels using
Microsoft Project versus Primavera Enterprise. Recommended and developed
Microsoft Project Server 2003 implementation plan, project management and
scheduling processes and procedures using Project Professional. ·
Developed and
documented project planning and scheduling standards and processes. ·
Defined the
scope of Project Server 2003 implementation plan, including resources,
software functionality, pilot and production deployment timeline, budget,
training plan, and production support requirements. ·
Recommended
reporting structure to support enterprise earned value and resource
allocation analysis. SeverCorr Steel, Columbus, MS Consolidated Microsoft Project 2003
schedules developed by SeverCorr and converted all schedule files to
Primavera 5.0 to develop the SeverCorr master schedule. ·
Ensured all
activities had a predecessor and successor, and that durations were less than
two reporting periods. Clearly defined schedule constraints and key
milestones. Verified the logical relationships, calendars, and constraints
for correct critical path analysis. ·
Updated
progress based on remaining effort and duration rather than assigning
completion percentages to provide an accurate and realistic schedule. Starcon International, Manhattan,
IL
05/2006 – 10/2006 Maintenance Planner / Project Manager Marathon Petroleum Company –
Catlettsburg, KY Planned and executed mechanical scope of
exchangers, towers, drums, relief, manual and motor operated valves during
Cumene turnaround. Coordinated unplanned activities during emergency FCC and
ALKY unit outages. Developed and maintained daily work schedule and updated
progress in Primavera 5.0. ·
Reduced
budget and cut project costs by $443,000 by revising critical path and
reducing and consolidating resources, tools and equipment. ·
Immediately
raised and tracked critical issues related to scope boundaries, and defined
the change management process to avoid cost and schedule overruns. ·
Utilized and
adhered to Marathon’s procurement, materials management, and accounting
structure so that cost spreadsheets were supported by purchase requests,
purchase orders, receiving tickets, invoices, and expense reports. ·
Performed
readiness review prior to shutdown – Reviewed bid package and contract,
finalized manpower projections and costs, verified all relevant engineering
drawings and specifications were received, organization chart completed,
capital and expense items planned and allocated, lessons learned
documentation from previous shutdowns reviewed for known or recurring issues
and standards, etc. ·
Executed
project using standardized procedures and documentation for weld mapping,
material procurement, certification and inspection, hydro and NDE testing,
and equipment sign off and closures. ·
Performed
daily walk downs and reviews of project scope to develop manpower, equipment,
tool, subcontractor and safety expectations, lift plans, crane setup
locations and timing, defined staging areas for materials, air compressors,
light plants, tool rooms, break areas and offices. Starcon International, Manhattan,
IL
02/2006 – 05/2006 Maintenance Planner Marathon Petroleum Company – St Paul
Park, MN Estimated new projects, maintained
construction work packages, monitored and revised project schedule with new
activities during Clean Fuels project and shutdown of Distillate Desulfurizing,
Heavy Distillate Hydrotreater, Saturate Gas and Isomerization units. ·
Planned all
piping, mechanical and civil revisions for Clean Fuels project and 2006
spring Turnaround. Coordinated dependant electrical and instrumentation tasks
where applicable. ·
Progressed
and updated schedule daily and reported planned versus actual hours, resource
productivity and schedule growth. Processed and tracked all change requests. Project Management Solutions, Glen Mills, PA
07/2005 – 02/2006 Project Planner State Farm Insurance – Bloomington,
IL Developed and maintained complex logic
network diagrams, and interdependent project schedules using Primavera
TeamPlay 4.1. Allocated specific task assignments for all project resources
for time reporting and activity updates. ·
Mentored and
trained new Schedulers and Project Managers during Primavera implementation
established standardized settings, reports, status gathering and update
procedures. ·
Performed
detailed schedule analysis, reported timeline and resource variances and EVA.
(Estimate To and At Completion costs, weekly, monthly and cumulative
Schedule and Cost Performance Index.) ·
Migrated and
imported active project schedules from MS Project 98 to Primavera 4.1. ·
Designed and
implemented several project schedules, including the Enterprise Claim System
(ECS) Program Testing schedule, incorporating Unit Server, Performance,
System, Integration, Regression, Training and Acceptance testing of 111 core
application components and over 76,000 requirements. S&B Engineers – Power Division, Houston, TX
10/2004 – 06/2005 Piping General Foreman Progress Energy – Bartow, FL Safely
completed the construction of several critical systems including Boiler
Feedwater, Instrument Air, Closed Cooling Water, and Demineralized Water
through hydro and in-service testing. ·
Initiated new
progress tracking and reporting procedures at the work package level to eliminate
redundancy. Consolidated daily progress reports for faster and simpler
auditing. ·
Created field
revision and extra work order packages that included estimated man hours,
scaffolding, materials and equipment required, reference drawings, and all
needed resources. PROFESSIONAL
TRAINING
Primavera Systems: Basic Course 101,
Intermediate Course 102, Advanced Course 106, 2005
1 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|